Manufacturing
From curation to sealed product — how a numbered Paragon One release is built.
CURATION
Cards are sourced, authenticated and selected for a specific release. Graded cards are verified against the grading company's registry.
CHECKLIST DRAFT
Every card is catalogued: year, player, set, card number, variation, grade and condition. The draft checklist is reviewed internally.
FINALIZATION
The release is finalized: total quantity locked, checklist published at its permanent URL, finalization statement and date recorded.
SEALING & MARKING
Products are assembled and sealed with tamper-evident P1 security labels. The manufacturer name, product line and release ID are printed prominently on the physical box, along with the QR code linking to the finalized checklist.
RELEASE
The numbered run ships to authorized sellers and live-selling platforms. The checklist remains publicly archived forever.
The 9-Step Process
Quality Control
Before release, each production run is reconciled against its finalized release checklist. Product identification, release identification, package integrity, tamper-evident security labels and checklist QR codes are verified before finished inventory is released for distribution.